💥 Gate Square Event: #PostToWinCGN 💥
Post original content on Gate Square related to CGN, Launchpool, or CandyDrop, and get a chance to share 1,333 CGN rewards!
📅 Event Period: Oct 24, 2025, 10:00 – Nov 4, 2025, 16:00 UTC
📌 Related Campaigns:
Launchpool 👉 https://www.gate.com/announcements/article/47771
CandyDrop 👉 https://www.gate.com/announcements/article/47763
📌 How to Participate:
1️⃣ Post original content related to CGN or one of the above campaigns (Launchpool / CandyDrop).
2️⃣ Content must be at least 80 words.
3️⃣ Add the hashtag #PostToWinCGN
4️⃣ Include a screenshot s
Guo Mingji, an analyst at TF International, said the mass production time of Tesla's Robotaxi is consistent with the previous survey results.
Jinshi data news on October 11th, Tianfeng International analyst Guo Mingchi said that the time of TSLRobotaxi’s mass production is consistent with the previous survey results. Musk said at the press conference: “I am more optimistic about the time frame, by 2026. Let’s just say that before 2027.” Considering Musk’s cautious wording and the use of 2027 as a watershed for the production schedule of Cybercab, and considering his past frequent mention of optimistic targets, I believe that the results of the release are consistent with the previous survey that Cybercab will start mass production in Q1 2027. It is still a long way from Q1 2027, and there is still a possibility of changes in the mass production time of Cybercab. The key points to observe in the coming months for TSL (TSLA.O) include: 1) the next financial report meeting, 2) the results of the U.S. presidential election, and 3) whether TSL can provide unsupervised fully autonomous driving (FSD) in California and Texas by 2025.